Tribune Media KFOR News Studio
Located on the same property as their existing broadcast facility, the new facility is a stand-alone, single story building approximately 8,000 square feet in size.
Read MoreWoodlake Trail Park
CEC provided electrical engineering services for the upcoming Woodlake Trail Park located in Carrollton, Texas.
Read MoreFiber Analysis in Oklahoma
This project included physical in-field height measurements of all existing conductors and telecommunication lines, as well as LiDAR scanning.
Read MoreMake-Ready Engineering for Bluepeak Fiber
In order to attach to new aerial fiber optic cable, CEC performed a full analysis of 5,695 poles in 29 separate work orders.
Read MoreScissortail Park
CEC provided engineering services to both the 40-acre upper and 30-acre lower park, the former opening in 2019 and the latter celebrating its grand opening in September 2022.
Read MoreUS-75 Okmulgee Subsurface Utility Engineering
CEC’s Subsurface Utility Engineering team provided Quality Level B SUE services to electronically identify existing utilities.
Read MoreMercy I-35 Primary Care Clinic
Mercy has expanded care in the Edmond, Oklahoma area with this comprehensive Primary Care Facility.
Read MoreUS-270 Widening
This was a turn key project to widen US-270 from 2 lanes to 4 lanes with several constraints and challenges in Seiling, OK.
Read More8-Inch and 18-Inch Waterline
CEC provided design services for the widening of the intersection at 2nd Street and Bryant Avenue.
Read MoreHospital Area Water Lines
CEC provided design services associated with developing construction documents for the replacement of multiple waterlines in the hospital area.
Read More