Water Mains and Pump Station No. 18 Expansions


water engineering, water engineers, water resources, water utility design, wastewater utility design, water professionals, stormwater design, water distribution design, wastewater collection design

CEC was retained by the Oklahoma City Water Utilities Trust (OCWUT) to provide design and construction administration services for a 42-inch water main. The project begins from the Lake Hefner Water Treatment Plan extending west approximately 7 miles along the north and west side of Lake Hefner Dam until it reaches Britton Road then west to Morgan Road. CEC also provided services to upsize Booster Pump Station No. 18.  Survey and route determination were included as part of the design.