SH-60 over Big Cabin Creek


SH-60 over Cabin Creek

The project consisted of construction of two new parallel bridge structures on the existing alignments. The purpose was to replace the two structurally deficient bridges. The objective was to replace two parallel bridges on SH-60 over Big Cabin Creek in Craig County for ODOT. The total project length was 1,100 feet.  

CEC provided hydrology and hydraulics, roadway design, bridge design, and survey services.   
Special design features included two twin bridges, prestressed concrete beam spans, and 45 degree skew.