Lee Boulevard


Lee Boulevard

CEC was responsible for the reconstruction of Lee Boulevard beginning at SH-115 and extending east for 5.5 miles in Comanche County District #3.  CEC provided survey, design, geotech, utility relocation coordination and utility relocation inspections.

The intent of the project was to reconstruct the existing road that was in failing condition and to improve the safety of the roadway.  

Design Features:

  • 5.5 miles of high volume county road
  • ADT of 4200
  • Special Design Drainage Structures
  • Numerous Utility Relocations