Creek Turnpike Widening


Creek Turnpike Widening

This project improved the roadway capacity, storm sewer system, and safety (signage, lighting, cable barrier) of the Creek Turnpike from US-75 to Memorial Drive.

Project Highlights:
-Widened 12.403 miles of highway
-Widened 4-lane highway to 6 lanes
-9 bridges widened
-11.27 miles of cable barrier installed
-180,000 square yards of paving
-American Concrete Pavement Association (ACPA) Silver Award Winner

CEC provided full service contract administration and inspection, as well as plan reviews, constructability reviews, and value engineering reviews.  CEC also provided Quality Assurance (QA) materials testing.