CEC offices are open and adhering to CDC Workplace Guidance. We continue to serve and support you!

Clear Creek Substation

substation design, physical substation design, electrical substation design, power engineering

CEC designed a new 69kV-26.4kV greenfield substation, new transmission tap line, and distribution underbuild for Western Farmers Electric Cooperative and Cotton Electric Cooperative. The greenfield substation design included the substation and site design. The design of the transmission line was for a 5.5 mile 69kV transmission line designed to 138kV standards connecting Duncan Tap to the new Clear Creek Substation. CEC delivered the plans under an accelerated schedule to meet the schedule opening of the oil and gas plant. CEC coordinated with WFEC, the G&T Cooperative, Cotton Electric, the distribution cooperative, and ONEOK, the customer.

Special Design Features Include:

  • Civil layout and drainage
  • Grounding Study & grid details
  • Foundation design
  • Cable Raceway and feeder exits
  • Electrical bus layout and steel erection