Edmond Water Tower


Edmond Water Tower

On the Corner of Coffee Creek Road and North Boulevard Street, the City of Edmond is constructing a 20 million gallon elevated storage tank for the Northwest Complex. The tank will have a bowl diameter of 95 feet, a 52-foot diameter pedestal, and an overall height of 141.5 feet. This project is one of the many recommended improvements for the City of Edmond Water and Wastewater Master Plan and is specifically intended to alleviate pressure fluctuation in the the northwest part of Edmond. Completion is set for September 2017.

CEC was hired by Landmark Structures to provide a variety of materials testing services including soil testing, concrete testing, compressive strength tests, and bearing surface observations.