Tribune Media KFOR News Studio
Located on the same property as their existing broadcast facility, the new facility is a stand-alone, single story building approximately 8,000 square feet in size.
Read More700 West Apartments and Garage: The Muse
CEC provided structural engineering for this 5-story, 260,000 total SF apartment complex with an adjoining 4-story, 120,000 total SF parking garage.
Read MoreOwasso Redbud Festival Park
CEC provided civil, structural, and MEP design for the construction of a centerpiece downtown park.
Read MoreThe Flats On Archer
This facility includes a rooftop entertaining space, meeting space, business center, as well as a multi-level fitness studio.
Read MoreFixico-Kolache River Crossing
CEC discovered washed out structures during a restoration project, and worked to evaluate multiple options for relocation of the line.
Read More