Service: Remote Sensing

Fiber Analysis in Oklahoma

This project included physical in-field height measurements of all existing conductors and telecommunication lines, as well as LiDAR scanning.

Read More

Hospital Area Water Lines

CEC provided design services associated with developing construction documents for the replacement of multiple waterlines in the hospital area.

Read More

23rd Street Waterline

The project consisted of replacing 2,800 linear feet of 16-inch waterline, multiple service line connections, fire hydrants, all associated valves and more

Read More

Olive Avenue Widening

The project included the reconstruction of approximately one mile of arterial roadway to widen the existing 2-lane open section roadway to a 5-lane roadway with curb and gutter.

Read More
1 2 3