Pole Loading Analysis in Texas
Our team performed Pole Loading Analysis on 1200 Xcel Energy poles in Texas.
Read MoreUAS LiDAR Transmission Line River Crossing
Utilizing a rotorcraft UAS, the data was acquired “low and slow” in order to capture a high point density.
Read MoreSeminole-Ashland Restoration
CEC assessed and restored a 38-mile transmission line, which included physical field inspection of 540 transmission structures.
Read MorePark Community-Kingfisher
Our team worked on an accelerated timeline and expedited design according to RUS and WFEC standards
Read MoreFixico-Kolache River Crossing
CEC discovered washed out structures during a restoration project, and worked to evaluate multiple options for relocation of the line.
Read MoreLoafman Substation
CEC was responsible for the site design, including drainage, earthwork and driveways. We coordinated with WFEC, REC, and Enerfin Energy to complete the design.
Read MoreAmber Substation
An accelerated schedule, drainage issues and plans for future expansion made this project both challenging and rewarding for our Power Delivery team and project partners
Read MoreRoadway Relocation Projects
CEC currently works with OG&E and city/government agencies to coordinate the relocation of facilities in conflict with proposed roadway plans
Read MorePaving Program Consultant
This project helps the City identify and address the community’s most distressed roadways.
Read More