City Of Richardson 30-Inch Waterline
CEC provided Quality Level B Designating and Quality Level A Test Holes for the City of Richardson.
Read MoreUS-75 Okmulgee Subsurface Utility Engineering
CEC’s Subsurface Utility Engineering team provided Quality Level B SUE services to electronically identify existing utilities.
Read MoreUS-80 Mesquite Subsurface Utility Engineering Test Holes
CEC provided Quality Level A test holes to expose existing utilities at 10 locations along the US-80.
Read More8-Inch and 18-Inch Waterline
CEC provided design services for the widening of the intersection at 2nd Street and Bryant Avenue.
Read MoreHospital Area Water Lines
CEC provided design services associated with developing construction documents for the replacement of multiple waterlines in the hospital area.
Read More23rd Street Waterline
The project consisted of replacing 2,800 linear feet of 16-inch waterline, multiple service line connections, fire hydrants, all associated valves and more
Read MoreSchool Safety Improvements
CEC provided design plans for sidewalk and ramp improvements to meet ADA requirements and improve safety for 22 schools in the Tulsa area.
Read MoreBryant Avenue Intersection
The purpose of the project was to increase the capacity and improve traffic flow at one of the City of Edmond’s busiest intersections.
Read MoreI-40 Exit Ramp and Main Street
CEC contracted with the City of Weatherford to provide design services for the redesign of an exit/entrance ramp and roadway improvements.
Read More700 West Apartments and Garage: The Muse
CEC provided structural engineering for this 5-story, 260,000 total SF apartment complex with an adjoining 4-story, 120,000 total SF parking garage.
Read More